North Shafter Sewer Project

3 Documents in Project

Summary

SCH Number
2007101126
Lead Agency
City of Shafter
Document Title
North Shafter Sewer Project
Document Type
NOD - Notice of Determination
Received
Posted
1/4/2008
Present Land Use
Residential & Commercial / R-1 (Low Density Residential), GC (General Commercial), NC (Neighborhood Commercial) / LR (Low Density Residential), CPO (Commercial/Office)
Document Description
A proposal to expand the City of Shafter's wastewater collection system in an area of the City not currently served by sewer. The proposed collection system will consist of approximately 12,434 linear for of new 8" sewer line with 206.4" sewer laterals extending to the property lines at all existing developed parcels. The system will include sewer wyes with plugs for future connection to all potential developable lots (approximately 12) within the project limits. All work will occur within existing streets and public rights-of-way within the City limits of Shafter. Approximately 1,250 linear feet of existing sewer trunk line will connect the expansion area to an existing lift station located approximately 1/4 mile south of Tulare Avenue.

Contact Information

Name
Suzanne Forrest
Agency Name
City of Shafter
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield, Shafter, Wasco
Counties
Kern
Cross Streets
Bounded by Hwy 43 (east), Park Ln and Mettler Ave (west), Tulare Ave (south), Mayer Ave (north)
Zip
93263
Total Acres
~ 72
Parcel #
Numerous
State Highways
43
Railways
BNSF
Schools
Redwood, Sequoia, Richland, Shafter HS
Township
28S
Range
25E
Section
4, 9
Base
MDB&M

Notice of Determination

Approving Agency
City of Shafter
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print