Ronald Reagan Sports Desiltation Basin Long-term Maintenance Project

3 Documents in Project

Summary

SCH Number
2007101084
Lead Agency
City of Temecula
Document Title
Ronald Reagan Sports Desiltation Basin Long-term Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2007
Present Land Use
Public Park and Recreation/Open Space
Document Description
Ongoing long-term routine maintence of an existing desiltation basin. The basin will be drained and sediment would be removed to restore the capacity of the basin to its original design elevation. The removed sediment would be spread in an adjacent disturbed area to dry, and then exported off site to an appropriate landfill. Willow riparian vegetation would be temporarily removed to accommodate the silt removal; a strip of willows (25 feet or greater) would be left around the edges of the basin to provide a visual buffer. Riparian vegetation would be allowed to grow between maintenance activities.

Contact Information

Name
William Becerra
Agency Name
City of Temecula Public Works
Contact Types
Lead/Public Agency

Location

Cities
Temecula
Counties
Riverside
Cross Streets
Rancho Vista Road and Margarita Road
Zip
92589
Total Acres
7.4
Parcel #
945-050-006
State Highways
SR-79, I-15
Schools
6 HS, 3 MS, 6 ES, 1 Academy, 2 Preparatory
Waterways
Temecula Creek, Murrieta Creek, Empire Creek, Long Canyon, and San Diego Aqueduct
Township
8S
Range
2W
Section
6, 7

Notice of Determination

Approving Agency
City of Temecula
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print