Durkin Family Trust (PIP 06-19)

2 Documents in Project

Summary

SCH Number
2007101076
Lead Agency
City of Carlsbad
Document Title
Durkin Family Trust (PIP 06-19)
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2008
Present Land Use
The project would be located on a vacant lot within the Carlsbad Airport Centre business park. The lot has a Planned Industrial (P-M) zoning designation and a Planned Industrial (PI) General Plan Use designation.
Document Description
The project consists of a City Council consistency determination for the McClellan-Palomar Airport Comprehensive Land Use Plan (CLUP) to conditionally allow an industrial use within the 75 dBA CNEL aircraft noise contour interval on Lot 25 of CT 81-46 (APN: 212-091-01). In addition, the project would include the construction of an industrial/office building on the lot. The industrial building would be approved with a Planned Industrial Permit (PIP 06-19) and would consist of a two-story, 29,919 square-foot building, 31 feet in height. The project would require 1,750 cubic yards of balanced cut and fill. The 2.71 acre parcel is bowl shaped and has previously been graded. The parcel is bounded on the south and east by industrial roadways and buildings, to the north by a public golf course, and to the west by an industrial building.

Contact Information

Name
Pam Drew
Agency Name
City of Carlsbad
Contact Types
Lead/Public Agency

Location

Cities
Carlsbad
Counties
San Diego
Cross Streets
Palomar Airport Road
Total Acres
2.71
Parcel #
212-091-01
State Highways
78 and 101
Railways
NCTD
Airports
McClellan/Palomar
Schools
Carlsbad Unified School District
Waterways
Agua Hedionda Lagoon, Pacific Ocean

Notice of Determination

Approving Agency
City of Carlsbad
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print