Lakeview/Nuevo Master Plan for Water, Sewer, & Recycled Water

4 Documents in Project

Summary

SCH Number
2007101043
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Lakeview/Nuevo Master Plan for Water, Sewer, & Recycled Water
Document Type
FIN - Final Document
Received
Present Land Use
PLU: Agriculture, Agriculture with a Community Development Overlay, Rural Mountainous, Rural Residential with a Community Development Overlay, Very Low, Low, Medium, Medium High, and Very High Density Residential, Open Space Recreational, Open Space Conservation, Open Space Conservation Habitat, Public Facilities, Water, Light Industrial, Community Center and Commercial Retail. Z: A-1-10 (Light Agriculture with 10 acre min. lot size), A-2-10 (Heavy Agricultural with 10 acre minimum lot size), Agriculture-Dairy (A-D), A-P (Light Agricultural with Poultry), C-P-S (Scenic Highway Commercial), C-R (Rural Commercial), M-SC (Manufacturing-Service Commercial), R-1 (One-Family Dwelling), R-2-1 (Residential Agricultural with a 1 acre min. lot size), R-A-10 (Residential Agricultural with a 10-acre minimum lot size), R-A-2.5 (Residential Agricultural with 2.5 acre min. lot size), R-A-5 (Residential Agricultural with a 5 acre min. lot size), R-R (Rural Residential) and Specific Plan Zone.
Document Description
The project proposes the adoption by the Eastern Municipal Water District (EMWD) of the Lakeview/Nuevo Area Wide Master Plan for Water, Sewer, and Recycled Water (Master Plan). The Master Plan proposes a comprehensive plan for its development of anticipated infrastructure facilities that will be needed to serve the rapidly growing number of development proposals within the Lakeview/Nuevo area. The facilities include approximately 179,520 feet of water transmission pipelines, reservoirs, approximately 112,992 feet of sewer collection and interceptor pipelines, and 99,264 feet of recycled water pipelines, which will be constructed underground primarily within existing and future road rights-of-way.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Lakeview Avenue and Ramona Expressway
Zip
92567,571
Total Acres
10,700
Schools
Nuview Union School District, Perris Union High School District
Waterways
San Jacinto River
Township
4S/5S
Range
3W/2W
Section
7-10..
Base
SBB&M
Other Location Info
Lakeview/Nuevo
Other Information
Section (cont): 16-18

Notice of Completion

Development Types
Water Facilities (Pipelines, Storage Tanks, Booster Stations, Recycled Water Pipel), Waste Treatment:Sewer (Pipelines, Lift Stations)
Local Actions
Master Plan
Project Issues
Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Sewer Capacity, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print