Lakeview/Nuevo Master Plan for Water, Sewer, & Recycled Water

4 Documents in Project

Summary

SCH Number
2007101043
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Lakeview/Nuevo Master Plan for Water, Sewer, & Recycled Water
Document Type
EIR - Draft EIR
Received
Present Land Use
PLU: Agriculture, Agriculture with a Community Development Overlay, Rural Mountainous, Rural Residential with a Community Development Overlay, Very Low, Low, Medium, Medium High, and Very High Density Residential, Open Space Recreational, Open Space Conservation, Open Space Conservation Habitat, Public Facilities, Water, Light Industrial, Community Center and Commercial Retail. Z: A-1-10 (Light Agriculture with 10 acre min. lot size), A-2-10 (Heavy Agricultural with 10 acre minimum lot size), Agriculture-Dairy (A-D), A-P (Light Agricultural with Poultry), C-P-S (Scenic Highway Commercial), C-R (Rural Commercial), M-SC (Manufacturing-Service Commercial), R-1 (One-Family Dwelling), R-2-1 (Residential Agricultural with a 1 acre min. lot size), R-A-10 (Residential Agricultural with a 10-acre minimum lot size), R-A-2.5 (Residential Agricultural with 2.5 acre min. lot size), R-A-5 (Residential Agricultural with a 5 acre min. lot size), R-R (Rural Residential) and Specific Plan Zone.
Document Description
The project proposes the adoption by the Eastern Municipal Water District (EMWD) of the Lakeview/Nuevo Area Wide Master Plan for Water, Sewer, and Recycled Water (Master Plan). The Master Plan proposes a comprehensive plan for its development of anticipated infrastructure facilities that will be needed to serve the rapidly growing number of development proposals within the Lakeview/Nuevo area. The facilities include approximately 179,520 feet of water transmission pipelines, reservoirs, approximately 112,992 feet of sewer collection and interceptor pipelines, and 99,264 feet of recycled water pipelines, which will be constructed underground primarily within existing and future road rights-of-way.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Lakeview Avenue and Ramona Expressway
Zip
92567,571
Total Acres
10,700
Schools
Nuview Union School District, Perris Union High School District
Waterways
San Jacinto River
Township
4S/5S
Range
3W/2W
Section
7-10..
Base
SBB&M
Other Location Info
Lakeview/Nuevo
Other Information
Section (cont): 16-18

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Fish and Wildlife, Region 6, Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, Resources, Recycling and Recovery, California Department of Health Care Services (DHCS)
State Reviewing Agency Comments
California Department of Health Care Services (DHCS)
Development Types
Water Facilities (Pipelines, Storage Tanks, Booster Stations, Recycled Water Pipel), Waste Treatment:Sewer (Pipelines, Lift Stations)
Local Actions
Master Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Sewer Capacity, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print