Callan Rezone and Lot Merger-Magnolia Properties
3 Documents in Project
Summary
SCH Number
2007092088
Lead Agency
City of Half Moon Bay
Document Title
Callan Rezone and Lot Merger-Magnolia Properties
Document Type
NOD - Notice of Determination
Received
Posted
1/17/2008
Present Land Use
Single-Family Residential (B-1-B-2) Residential-Medium Density
Document Description
The project is to rezone approximately 35,143 square feet (0.80-acre) site from the existing Single-Family Residential (R-1-B-2) zoning designation to a Single-Family Residential (R-1-B-1) zoning designation. In order to be consistent with the new R-1-B-1 zoning designation and its development standards, the nine contiguous lots will be merged into four standard-sized lots for the future development of four single-family residences. The proposed project will not change the existing Local Coastal Program/Land Use Plan (Residential-Medium Density) which designates areas that are already partially developed and that have potential for in-fill development at densities comparable to those already existing. The project is within the Coastal Appeal Zone and thus is appealable to the California Coastal Commission upon exhaustion of all local appeals. City File: PDP-013-06.
Contact Information
Name
Tonya Ward
Agency Name
City of Half Moon Bay
Contact Types
Lead/Public Agency
Phone
Location
Cities
Half Moon Bay
Counties
San Mateo
Cross Streets
Magnolia Street and Second Avenue
Zip
94019
Total Acres
.80
Parcel #
064-332-180, 190, 200
State Highways
State Highway 1
Schools
Cabrillo Unified School District
Waterways
Pacific Ocean
Notice of Determination
Approving Agency
City of Half Moon Bay City Council
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.