Major Amendment No.4 Lower Berryessa and Lower Calera Creek Flood Protection Improvements Project (Lake or Streambed Alteration Agreement No. 1600-2013-0159-R3)

4 Documents in Project

Summary

SCH Number
2007092084
Lead Agency
Santa Clara Valley Water District
Document Title
Major Amendment No.4 Lower Berryessa and Lower Calera Creek Flood Protection Improvements Project (Lake or Streambed Alteration Agreement No. 1600-2013-0159-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Fish and Wildlife (CDFW) has executed the Major Amendment No. 4 for the Lake and Streambed Alteration Agreement number 1600-2013-0159-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Melanie Richardson, Santa Clara Valley Water District. The overall project includes creek channel improvements that will result in the containment of flow in the channel with adequate freeboard requirements in Lower Berryessa and Lower Calera Creeks. This NOD is limited to the redesigns in Lower Calera Creek and include; removal and replacement of a concrete U-frame channel with a new one, placement of 1-foot of sediment on the channel bottom, replacement of a channel access road and ramp, installation of headwalls, reducing the length and increasing the heights of concrete floodwalls, and removing sacked concrete and replacing with rock riprap.

Contact Information
Mayra Molina
CDFW
2825 Cordelia Road, Suite 100
Fairfield, CA 95434

707.428.2067

Location

Cities
Milpitas
Counties
Santa Clara
Other Location Info
Lower Calera Creek Reaches A and B begin from the Union Pacific Railroad to Arizona Avenue in the City of Milpitas, County of Santa Clara, State of California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
2825 Cordelia Road, Suite 100 Fairfield, CA 95434

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2007092084   PDF 829 K
Download CSV New Search