Easkoot Creek Sediment Removal at Bridge Crossings

5 Documents in Project

Summary

SCH Number
2007092065
Lead Agency
Marin County
Document Title
Easkoot Creek Sediment Removal at Bridge Crossings
Document Type
NOD - Notice of Determination
Received
Posted
3/15/2013
Present Land Use
C-MF2 1-4 units per acre (Coastal Multi-Family)
Document Description
In this addendum, the original 2007 project description has been modified to include the following activities: 1) Construction of an additional sediment removal site (#2) within the floodprone plain of the Easkoot Creek and annual sediment removal from this site. 2) Annual sediment removal at all established sediment removal sites on an as needed basis; 3) Dewatering of the Easkoot Creek channel when necessary for sediment removal including fish relocation as needed, to avoid impacts to native salmonid populations; 4) Low-impact vegetation maintenance for flood control purposes in sections of the Easkoot mainstem that are maintained as flood control easements or where the Flood Control District has a landowner access agreement in place with private property owners.

Contact Information

Name
Kallie Kull
Agency Name
Marin County Flood Control and Water Conservation District
Contact Types
Lead/Public Agency

Location

Counties
Marin
Cross Streets
Arenal Ave, Calle del Pinos, Calle del Prader, Calle del Sierra, Calle del Onda,Calle del Arroyo
Zip
94970
State Highways
U.S. Hwy. 1
Waterways
Easkoot Creek
Other Location Info
Stinson Beach

Notice of Determination

Approving Agency
Department of Public Works
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print