Easkoot Creek Sediment Removal
5 Documents in Project
Summary
SCH Number
2007092065
Lead Agency
Marin County
Document Title
Easkoot Creek Sediment Removal
Document Type
NEG - Negative Declaration
Received
Present Land Use
C-MF2 1-4 units per acre (Coastal Multi-Family)
Document Description
The Director of the Marin County Dept. of Public Works will consider approval of sediment removal from Easkoot Creek, as a flood control measure within the Town of Stinson Beach. Sediment will be removed from the creek channel immediately upstream and downstream of the six bridge crossings with Easkoot Creek: No more than 20 cubic yards will be removed per crossing. The County is proposing to conduct sediment removal in October 2007, in conjunction with a monitoring program to assess the effectiveness of this activity on the creek channel and flood flow capacity. The material to be removed washed into the creek from the 2005-2006 New Year's Flood. All sediment removed will be taken to a legal spoils disposal site.
Contact Information
Name
Neal Conatser
Agency Name
Marin County Public Works Dept.
Contact Types
Lead/Public Agency
Phone
Location
Counties
Marin
Cross Streets
Arenal Ave, Calle del Pinos, Calle del Prader, Calle del Sierra, Calle del Onda,Calle del Arroyo
Zip
94970
State Highways
U.S. Hwy. 1
Waterways
Easkoot Creek
Other Location Info
Stinson Beach
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Historic Preservation, Resources Agency, California Department of Transportation, District 4 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 4 (DOT)
Development Types
Other (Flood Control Routine Maintenance)
Project Issues
Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Transportation, Vegetation, Wetland/Riparian, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.