Redcrest Storm Damage Restoration Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007092063
- Lead Agency
- California Department of Transportation, District 1
- Document Title
- Redcrest Storm Damage Restoration Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/1/2008
- Present Land Use
- Transportation, State of California
- Document Description
- The project includes reconstruction of the 4 lane highway, construction of a tieback retaining wall, replacing a separated culvert, installation of two headwall, placement of erosion protection, and revegetating all disturbed areas. Roadway reconstruction will require realigning the existing roadway, stabilizing the fill slopes and reconstructing the northbound lanes.
- Contact Information
-
Stephanie Coleman
California Department of Transportation
Lead/Public Agency
1656 Union St.
Eureka, CA 95501
Phone : (707) 445-5320
Location
- Counties
- Humboldt
- Cross Streets
- On Highway 101 between post miles 40.9 and 42.2
- Total Acres
- 2.7
- Parcel #
- Public property
- State Highways
- 101 and 254
- Schools
- Georgeson School
- Waterways
- Chadd Creek and Eel River
- Township
- 1S
- Range
- 2E
- Section
- 15
- Base
- Redcrest
- Other Location Info
- City/Nearest Community: Redcrest
Notice of Determination
- Approving Agency
- Caltrans
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 1656 Union St., Eureka, CA 95501 and http://dot.ca.gov/dist1/
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.