Siskiyou County Road Department Little Lynn Pit Use Permit and Reclamation Plan (UP-07-02/RP-07-01)

2 Documents in Project

Summary

SCH Number
2007092040
Lead Agency
Siskiyou County
Document Title
Siskiyou County Road Department Little Lynn Pit Use Permit and Reclamation Plan (UP-07-02/RP-07-01)
Document Type
NOD - Notice of Determination
Received
Posted
2/15/2008
Present Land Use
Land Use: One single family residence and agricultural uses including dry land grazing. Zoning: AG-1 (Prime Agricultural), AG-2-B-40 (Non-Prime Agricultural, 40 acre minimum parcel size). General Plan: Prime Soils Resource Area, Erosion Hazard Area, Severe Septic Tank Limitations Area.
Document Description
Use Permit and Reclamation Plan to operate a 16-acre, open-pit, surface mining operation on a 236-acre parcel. Approximately 140,000 cubic yards of material is planned to be harvested intermittently over a 12-year mine life with annual production estimated at 12,500 cubic yards. Mineral extraction, screening, crushing, stockpiling, and material export are being planned. Reclamation would be re-contouring of the site to bring the existing elevation level with the surrounding grade and re-vegetation for non-prime agricultural uses.

Contact Information

Name
Rowland Hickel
Agency Name
Siskiyou County Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Montague
Counties
Siskiyou
Cross Streets
Ager Road
Zip
96064
Total Acres
236
Parcel #
013-280-440
Airports
Montague Yreka Rohrer Field
Township
45N
Range
6W
Section
16
Base
MDB&M

Notice of Determination

Approving Agency
Siskiyou County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print