Dixon Main Drain V-Drain Enlargement Project (Streambed Alteration Agreement No. 1600-2014-0423-R3)

5 Documents in Project

Summary

SCH Number
2007092033
Lead Agency
Dixon Regional Watershed Joint Powers Authority
Document Title
Dixon Main Drain V-Drain Enlargement Project (Streambed Alteration Agreement No. 1600-2014-0423-R3)
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2015
Document Description
CDFW has executed lake and streambed alteration agreement no. 1600-2014-0423-R3, pursuant to section 1602 of the fish and game code to the project Applicant, Dixon Watershed Real Property Acquisition Joint Powers Authority. The proposed project includes the enlargement of the Dixon Main Drain, the enlargement of the V-Drain from Swan Road to the RD 2068 Intake Canal, the replacement of 2 60-in culverts along Swan Road with an engineered conspan, the removal of 1 agricultural weir, the relocation of 1 agricultural weir, and the relocation of a highline irrigation canal. The Dixon Main Drain enlargement would run parallel to Swan Road from near the abandoned railroad tracks to the terminus at the V-Drain. The V-Drain enlargement would start at that intersection to terminus at the RD 2068 Intake Canal.

Contact Information

Name
Andrea Boertien
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Dixon
Counties
Solano
Cross Streets
Swan Road
Zip
95620
Waterways
Haas Slough, Duck Slough
Township
6N
Range
2E
Section
15...
Base
MDBM
Other Information
section: 16, 21, 22, 27, 28, 33, 34

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print