Cullinan Ranch Restoration Project Final EIR
11 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007092004
- Lead Agency
- Fish & Game #3
- Document Title
- Cullinan Ranch Restoration Project Final EIR
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/29/2012
- Document Description
- The project consists of a 1,575-acre habitat, enhancement and restoration at the Cullinan Ranch Restoration Project Site, a former tidal marsh adjacent to the Napa River Unit of the Napa-Sonoma Marshes Wildlife Area in San Pablo Bay and west of the City of Vallejo along Highway 37. Tidal action would be restored to the site by constructing four breaches to create a habitat to benefit estuarine biota such as birds, fishes and small mammals. The California State Lands Commission action is a 3-year General Lease - Public Agency use to U.S. Fish and Wildlife Service as the project proponent through May 23, 2015, for temporary sediment offloading facility and a dredged material slurry pipeline in the Napa River and Dutchman Slough.
- Contact Information
-
Nick Lavoie
California State Lands Commission
Lead/Public Agency
100 Howe Avenue, Suite 100-South
Sacramento, CA 95825-8202
Phone : (916) 574-1900
Location
- Cities
- Vallejo
- Counties
- Napa Solano
- Cross Streets
- Highway 37 between DFG Pond 1 and Guadalcanal Village
- Zip
- 94954
- Total Acres
- 1,525
- State Highways
- 37
- Waterways
- San Pablo Bay
- Township
- 4N
- Range
- 4W
- Section
- 31
Notice of Determination
- Approving Agency
- California State Lands Commission
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 100 Howe Avenue, Suite 100-South, Sacramento, CA 95825-8202
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.