General Lease - Non Commercial Use
3 Documents in Project
Summary
SCH Number
2007091143
Lead Agency
Orange County
Document Title
General Lease - Non Commercial Use
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2008
Present Land Use
Open Space - Conservation (OS-C)
Document Description
Issuance of a General Lease - Non Commercial Use, to the Huntington Beach Wetlands Conservancy, beginning June 24, 2008, for a term of fifteen years, for the 1) restoration of the Talbert Ocean Outlet Channel (Channel), including initial dredging of a maximum of 29,000 cubic yards of material, 2) perform two maintenance dredging episodes at five and ten year intervals at teh channel, totaling a maximum of 200,000 cubic yards of material and 3) depoit approximately 151,000 cubic yards of suitable dredged material in the near shore and/or below the mean high tide line on the adjacent Huntington state beach during the initial restoration and deposit a maximum total 200,000 cubic yards of said material in the subsequent five and ten year maintenance dredging intervals at said location.
Contact Information
Name
Paul Thayer
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency
Phone
Location
Cities
Huntington Beach
Counties
Orange
Cross Streets
Pacific Coast Hwy. and Brookhurst St.
Zip
92605
Total Acres
~130
State Highways
1
Schools
JH Eader El., Edison HS
Waterways
Huntington Beach Channel, Talbert Channel, and Santa Ana River
Township
6S
Range
10W
Notice of Determination
Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.