Brea Mall Expansion

Summary

SCH Number
2007091127
Lead Agency
City of Brea
Document Title
Brea Mall Expansion
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Parking for the Existing Mall/CC (PD)/Regional Commercial
Document Description
The proposed project includes construction and operation of the expansion of the Brea Mall. The majority of the development would occur along the State College Boulevard and Imperial Highway (90) of the mall at the existing southerly mall entrance. The expansion includes a total of approximately 200,000 square feet of retail space and restaurant use in nine new one and two-level buildings. No more than 80,000 square feet would consist of restaurants. Five new retail buildings are proposed along the easterly and southerly side of the existing Sears. Two of these retail buildings would be two-story and three would be one-story. The remaining four one-story buildings would be restaurants to the south of the existing Sears building. In addition, the existing surface parking lot located at the southerly mall main entry would be reconfigured due to the retail and restaurant buildings and 90 degree parking stalls along with two-way drive isles would be provided. Finally, a six level parking structure would be provided adjacent to the existing Sears southerly entry, which would accommodate the additional cars required for the new retail and restaurants uses. There would be a total of 1,622 parking spaces in the parking structure.

Contact Information

Name
Alice Tieu
Agency Name
City of Brea
Contact Types
Lead/Public Agency

Location

Cities
Brea
Counties
Orange
Cross Streets
South State College Boulevard and East Imperial Highway (90)
Total Acres
83
Parcel #
various
State Highways
SR-57, I-10, SR-60
Schools
Brea-Olinda Unified,Brea-Olinda Friends,...
Township
2S
Range
9W
Base
SB
Other Information
schools: Christian School, Laurel Elementary School, Brea Junior High School, Brea County Elementary School, St. Angela Merici Catholic School, Rolling Hills Elementary, William E. Fanning Elem.,Montessori of Brea Inc.,Brea Canyon High,Pathway Christian Academy,Christ Lutheran Church of Brea,Brea Olinda High,Parkview Independent Study K9,Arovista Elem.,JK Turffree Junior,Sierra Vista Child Care, Sierra Vista Elem.,Brea Olinda School District Transport,Mariposa Elementary,and Eastside Christian Pre-school

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Water Resources, Resources Agency, California Native American Heritage Commission (NAHC), Department of Toxic Substances Control, California Department of Transportation, District 12 (DOT)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), Department of Toxic Substances Control, California Department of Transportation, District 12 (DOT)
Development Types
Other (Retail: 138,170 square feet; Restaurant:61,830 square feet)
Local Actions
Mall Expansion
Project Issues
Aesthetics, Air Quality, Cumulative Effects, Noise, Transportation

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print