Microgy Bar 20 Gas Pipeline, Agreement No. 2008-0197-R4
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007091073
- Lead Agency
- San Joaquin Valley Air Pollution Control District
- Document Title
- Microgy Bar 20 Gas Pipeline, Agreement No. 2008-0197-R4
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/9/2009
- Present Land Use
- AE-20 (Exclusive Agriculture 20-Acre Minimum)
- Document Description
- The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code for the Microgy Bar 20 Gas Pipeline. The County of Fresno has approved the installation and operation of an anaerobic digester facility with a maximum height of sixty feet at the Shehadey Dairy. The anaerobic digester will collect and digest cow manure from the dairy and import non-hazardous agricultural waste materials to produce biogas. The biogas will then be piped by an approximately 5.5 mile underground pipeline that will extend from the Shehadey Dairy to an existing PG&E pipeline. The pipeline will be routed underneath the San Joaquin River.
- Contact Information
-
Annette Tenneboe
California Department of Fish and Game
Central Region 1234 East Shaw Avenue
Fresno, CA 93710
Phone : (559) 243-4014 x231
Location
- Cities
- Kerman
- Counties
- Fresno
- Cross Streets
- 24387 Whites Bridge Road (State Route 180)
- Zip
- 93630
- Total Acres
- 482
- Township
- 13S
- Range
- 16E
- Section
- 5
- Base
- MDB&M
Notice of Determination
- Approving Agency
- CDFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- County of Fresno 2220 Tulare Street, Suite A Fresno, CA 93721
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.