Gravity Main Ductile Iron Pipe Cured-In-Place Pipe Rehabilitation Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-5698-110

15 Documents in Project

Summary

SCH Number
2007091072
Lead Agency
City of Vista
Document Title
Gravity Main Ductile Iron Pipe Cured-In-Place Pipe Rehabilitation Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-5698-110
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2012
Present Land Use
Various - Project would be located throughout the City.
Document Description
The Project will provide greater collection system reliability, and decrease infiltration and inflow and sanitary sewer overflows. The Project involves rehabilitating approximately 10,800 feet of the existing 36-inch ductile iron pipe using the cured-in-place pipe rehabilitation methods. The Project also involves rehabilitating 25 manholes along the pipeline route using either spray-on epoxy or a polyurethane liner.

Contact Information

Name
Ahmad Kashkoli
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Vista
Counties
San Diego
Cross Streets
intersection of Hacienda Dr/Thunder Dr to intersection of Hacienda Dr/S. Melrose Dr
Zip
92084
Total Acres
3 mi
Parcel #
multiple
State Highways
SR 78
Railways
Sprinter
Airports
No
Schools
St. Francis of Assisi,
Waterways
Buena Vista Creek
Other Information
Schools: Tri City Christian H.S. and Halstrom H.S.

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print