Van Buren Boulevard Pipeline Project

Summary

SCH Number
2007091063
Lead Agency
Western Municipal Water District
Document Title
Van Buren Boulevard Pipeline Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Land Use: As a City roadway, Van Buren Boulevard does not have a General Plan land use designation. However, according to the City of Riverside General Plan Land Use Map (dated Aug. 17, 2005), the project alignment is surrounded by multiple land use designations, including Residential High Density (RHD), Industrial Business Park (IBP), Commercial Business and Office (COB), and Natural Open Space (NOS). Zoning: As a city roadway, Van Buren Boulevard does not have a General Plan Zoning Designation. However, according to the City of Riverside Zoning Map (dated May 2005), the project alignment is surrounded by multiple zoning designations, including Residential-3 (R-3), Manufacturing Park (MP), Airport (AIR), and Restricted Commercial (C-2).
Document Description
Western Municipal Water District proposes a 2,500 linear foot pipeline segment, consisting of 54-inch diameter potable water conveyance pipeline. The pipeline alignment would occur within the existing Van Buren Boulevard right-of-way. A small portion of the alignment would extend to the west into the Van Buren Boulevard/Doolittle Avenue intersection, at the alignment's northern terminus. The proposed alignment would also extend slightly to the east, into the intersection of Van Buren Boulevard and Jackson Street. Jack/bore pits and construction staging/parking areas would occur in existing disturbed/developed areas outside of existing street rights of way.

Contact Information

Name
Jack Safely
Agency Name
Western Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Cross Streets
Van Buren Boulevard and Arlington Avenue
Zip
92505
Railways
Metrolink
Airports
Riverside Municipal Airport
Waterways
Santa Ana River
Township
2S, 3S
Range
5W, 6W
Section
1,6,31
Base
SBB&M
Other Information
Sections (con't): 36

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Highway Patrol, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Fish and Wildlife, Region 6, Department of Water Resources, Resources Agency, State Water Resources Control Board, Divison of Financial Assistance, California Native American Heritage Commission (NAHC), California Department of Transportation, District 8 (DOT), Caltrans, Division of Aeronautics
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Transportation, District 8 (DOT), Caltrans, Division of Aeronautics
Development Types
Water Facilities (Type Pipeline)
Local Actions
Water pipeline
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print