Lakeplant Well No. 6 Project
2 Documents in Project
Summary
SCH Number
2007091032
Lead Agency
City of Big Bear Lake
Document Title
Lakeplant Well No. 6 Project
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2007
Document Description
The objective of the proposed well is to increase water production to meet peak day demand requirements of existing development and future connections. The proposed Lakeplant Well No. 6 would allow increased well pump cycling so that existing DWP wells could be turned off more frequently, thereby reducing localized water table drawdown associated with pumping. The proposed production well would also serve to replace production lost because existing wells have been removed from production for maintenance, water quality, or other reasons. The DWP evaluated geologic literature, the mapping of sedimentary materials in Bear Valley, and the results of recently conducted test wells. The proposed project is the drilling of a new production well just west of Big Bear Boulevard located on the south side of Bear Valley. The proposed project site is located on a DWP owned property already developed with other well facilities. The property is a strip of land located between existing commercial developments and bounded on the northwest by Big Bear Boulevard and on the south by Fox Farm Road.
Contact Information
Name
Bill La Haye
Agency Name
City of Big Bear Lake
Contact Types
Lead/Public Agency
Phone
Location
Cities
Big Bear Lake
Counties
San Bernardino
Cross Streets
Fox Farm Road and Big Bear Boulevard
State Highways
38
Airports
Big Bear Airport
Waterways
Big Bear Lake
Township
2N
Range
1E
Section
21
Base
SBB&M
Notice of Determination
Approving Agency
City of Big Bear Lake Dept. of Water and Power
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.