Donahue Lot Split (Tentative Parcel Map TPM07-03/Development Review Permit DR07-06/AEIS07-10)

Summary

SCH Number
2007089019
Lead Agency
City of Santee
Document Title
Donahue Lot Split (Tentative Parcel Map TPM07-03/Development Review Permit DR07-06/AEIS07-10)
Document Type
NOD - Notice of Determination
Received
Posted
8/3/2007
Document Description
The proposed project is a Tentative Parcel Map (TPM07-03) to create two residential lots on a 0.54 acre parcel and a Development Review Permit (DR07-06 and for the development of one single family residence, a new paved driveway within an access and utility easement, drainage improvements and site landscaping. The proposed lot area of Parcel 1 and Parcel 2 are 10,447 square feet and 13,209 square feet respectively. The construction of one single family residence is proposed on Parcel 2. The single family residence will be 3,411 square feet including an attached three car garage. Within the southeastern portion of Parcel 2, and existing 528 square foot two-car garage will remain. An existing single story, single family residence is proposed to remain on Parcel 1. The two residential lots will take access from an access and utility easement off of Pryor Drive. The project is conditioned to provide a 26 foot wide paved driveway within the easement that will lead to two separate 12 foot driveways on Parcels 1 and 2. An AC berm is proposed to be built along the eastern side of the paved driveway to convey site drainage to the existing storm drain system on Pryor Drive.

Contact Information

Name
Josh McMurray
Agency Name
City of Santee
Contact Types
Lead/Public Agency

Location

Cities
Santee
Counties
San Diego
Parcel #
341-202-13

Notice of Determination

Approving Agency
City of Santee
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print