Hot Water Supply and Return Piping Loop Replacement Project

Summary

SCH Number
2007088408
Public Agency
California Department of Corrections and Rehabilitation (CDCR)
Document Title
Hot Water Supply and Return Piping Loop Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
8/29/2007
Document Description
The proposed project would replace the hot water supply and return piping loop form the prison's Central Boiler Plant to the currently serviced buildings within PBSP grounds. The project is required because the existing pipe has deteriorated and leaks are found throughout the existing heating water loop. The leaks occur at a rate that prevents the balance of chemical corrosion inhibitor in the existing loop and causes the hot water heat exchangers, heating and air conditioning coils, boiler tubes, pumps, and pipes to scale and render PBSP inhabitable for inmates due to health and safety regulations.

Contact Information

Name
Cher Daniels
Agency Name
California Department of Corrections and Rehabilitation
Contact Types
Lead/Public Agency

Location

Counties
Del Norte

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
This project consists of repairs and minor alterations of an existing public structure involving negligible or no expansion of use.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print