EcoCenter/Sea Scout Base

5 Documents in Project

Summary

SCH Number
2007082128
Lead Agency
City of Palo Alto
Document Title
EcoCenter/Sea Scout Base
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2008
Present Land Use
Vacant historic building (Sea Scout Base)/Zoning: Public Facility with Site and Design Overlay/General Plan: Publicly Owned Conservation Land
Document Description
The proposed project involves the relocation, rehabilitation and reuse of a vacant Category I historic building, the former Sea Scout Base. The building would be moved approximately 4 feet northwesterly of the existing location, away from the bay, in order to place the building on a new foundation, raising the building 3.5 feet and clearing the 100 year base flood elevation. This building is currently in an area subject to flooding due to high tides and has deteriorated significantly as a result. As part of the improvements to the existing 2,600 square foot building, an addition of approximately 261 square feet will be added onto the second floor mezzanine. The project also includes construction of a 3-stall parking lot with areas for a trash and mechanical enclosures, removal of portions of an existing sandbag "seawall," removal of a berm between the building and the road, rerouting of an existing trail, and landscape improvements.

Contact Information

Name
Clare Campbell
Agency Name
City of Palo Alto
Contact Types
Lead/Public Agency

Location

Cities
Palo Alto
Counties
Santa Clara
Cross Streets
Embarcadero Road / Harbor Road (2560 Embarcadero Road, Palo Alto)
Zip
94303
Parcel #
008-05-001
State Highways
101
Airports
Palo Alto Airport
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
City of Palo Alto
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.