Freight Railroad Relocation and Lower Berryessa Creek Project

3 Documents in Project

Summary

SCH Number
2007082107
Lead Agency
Santa Clara Valley Transportation Authority
Document Title
Freight Railroad Relocation and Lower Berryessa Creek Project
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2008
Present Land Use
Existing freight railroad corridor. Properties adjacent to the existing railroad corridor include Industrial, Commercial, and Residential.
Document Description
The Berryessa Creek culvert is a shared project between the VTA and the Santa Clara Valley Water District. The Freight Railroad Relocation Project would not require the creek to be realigned; however, as a part of a future SCVWD flood control project the creek must be widened and realigned. The entire multi-cell structure is planned to be built in concert with the Freight Railroad Reloction Project. The scope of work at Berryessa Creek includes constructing temporary tracks, to facilitate the construction of the multiple cell box culvert for Berryessa Creek, utility relocations, channel reconnection work, retrofitting the Abel Street bridge footings, and seismically retrofitting the Abel Street Bridge. The existing creek bottom outside the work limits will remain undisturbed.

Contact Information

Name
David W. Dunlap
Agency Name
Santa Clara Valley Water District
Contact Types
Lead/Public Agency

Location

Cities
Fremont, Milpitas
Counties
Alameda, Santa Clara
Cross Streets
Mission Blvd, Warren Ave, Kato Road, Dixon Landing Road, Abel St, Calaveras Blvd.
Zip
Multiple
Total Acres
80
Parcel #
Multiple
State Highways
880, 680, 262
Railways
UPRR
Waterways
Agua Caliente, Berryessa Creek, Toroges Creek, Wrigley Creek, Scott Creek

Notice of Determination

Approving Agency
Santa Clara Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.