Lake or Streambed Alteration Agreement No. R1-08-0045, Bridge over Upper North Fork Mattole Park

3 Documents in Project

Summary

SCH Number
2007082032
Lead Agency
Humboldt County
Document Title
Lake or Streambed Alteration Agreement No. R1-08-0045, Bridge over Upper North Fork Mattole Park
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2008
Present Land Use
Land Use: The property consists of agricultural and timber resource lands. The property is surrounded by large-acreage resource lands, and is developed with three residences served by on-site water and sewage disposal systems. Zoning: Timber Production Zone, Agricultural Exclusive. General Plan: Timber Production; Agricultural Grazing; Agricultural Lands (Framework Plan).
Document Description
The Project proposes to install a permanent 89 foot long by 9 foot wide bridge, place 975 tons of rip rap, water draft for cement mixing, and wet ford the river approximately ten time on the Upper Northe Fork Mattole River, Humboldt County.

Contact Information

Name
Anita Punla
Agency Name
Humboldt County Community Development Services
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Mattole and Burrell
Zip
95545
Total Acres
~ 4,000
Parcel #
107-021-02, et al.
State Highways
101
Waterways
North Fork Mattole River
Township
3S,2S
Range
1W
Section
1, 2,
Base
HB&M
Other Location Info
City/Nearest Community: Honeydew
Other Information
Section (con't): 11-15, 22-26, 35, 36

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print