Tehachapi Renewable Transmission Project (TRTP) Segment 7 and 8, Southern CA Edison Company, Notification No. 1600-2010-0026-R5

17 Documents in Project

Summary

SCH Number
2007081156
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Tehachapi Renewable Transmission Project (TRTP) Segment 7 and 8, Southern CA Edison Company, Notification No. 1600-2010-0026-R5
Document Type
NOD - Notice of Determination
Received
Posted
2/2/2011
Document Description
The Project includes construction and operation of 149 miles of 500kV and 29 miles of 220kV Transmission lines, and associated substations. The Project as approved by the Lead Agency will alter the existing topography through grading for the construction and installation of roads, construction and upgrade of substations, and electrical transmission and communication systems. Grading for the Project will place fill in a portion of an unnamed desert wash that dissipates to sheet flow in the middle of the proposed Whirlwind Substation site. Fill material will be placed into approximately 390 linear feet of CA Department of Fish and Game ("CDFG") jurisdictional ephemeral drainage (approximately 0.03 acres of permanent disturbance, and 43 cubic yards of fill). A new, concrete-lined or rip-rapped channel will be constructed to divert flows around the Whirlwind Substation and distribute sheet flow south of the site. Equipment used for construction will include two (2) D9 Caterpillar tractors with side board, four (4) graders/scrapers, two (2) water trucks, and two (2) backhoes for placement of reinforced concrete pipe. The CDFG is issuing the Streambed Alteration Agreement referenced above as a responsible agency under the CEQA.

Contact Information

Name
John Boccio
Agency Name
Department of Fish and Game Central Region
Contact Types
Lead/Public Agency

Location

Cities
Ontario, Tehachapi
Counties
Kern, Los Angeles, San Bernardino
State Highways
2, 14, 19, 39, 57, 60, 138
Waterways
San Gabriel River, Rio Hondo, Amargosa Creek
Other Location Info
Crosses 23 cities

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.