Tehachapi Renewable Transmission Project (TRTP) Segment 7 and 8, Southern CA Edison Company, Notification No. 1600-2010-0026-R5
17 Documents in Project
Summary
SCH Number
2007081156
Lead Agency
California Public Utilities Commission
(CPUC)
Document Title
Tehachapi Renewable Transmission Project (TRTP) Segment 7 and 8, Southern CA Edison Company, Notification No. 1600-2010-0026-R5
Document Type
NOD - Notice of Determination
Received
Posted
1/28/2011
Document Description
This Agreement includes 49 miles of 500kV and seven (7) miles of 220kV Transmission lines. The alignment includes the placement of approximately 313 new lattice steel towers (LST) and seventy two (72) tubular steel poles (TSP). Approximately, three hundred and thirteen (313) towers will be removed. Typical disturbance activities associated with Transmission line installation and update includes: wire setup sites (pulling sites); guard structures, construction work areas around each tower location; new access roads; and modification of existing access roads. Project activities within the stream zone include: trimming, crushing, grading and/or grubbing vegetation; installation of new, and repair or replacement of existing, culverts and dip crossings; and filling channels to create temporary construction pads. Project locations which anticipate significant impacts to streams are described below. The remaining impacts minor impacts associated with regrading of existing access roads and tower removal.
Contact Information
Name
Erinn WIlson
Agency Name
Department of Fish and Game South Coast Region
Contact Types
Lead/Public Agency
Phone
Location
Cities
Ontario, Tehachapi
Counties
Kern, Los Angeles, San Bernardino
State Highways
2, 14, 19, 39, 57, 60, 138
Waterways
San Gabriel River, Rio Hondo, Amargosa Creek
Other Location Info
Crosses 23 cities
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.