Tehachapi Renewable Transmission Project (TRtP) Segment 7, and 8, Southern California Edison Company, Notification No. 1600-2010-0026-R5 Major Amendment 2

17 Documents in Project

Summary

SCH Number
2007081156
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Tehachapi Renewable Transmission Project (TRtP) Segment 7, and 8, Southern California Edison Company, Notification No. 1600-2010-0026-R5 Major Amendment 2
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Multiple Land Uses (Proposed proposed crosses 3 Counties and 23 Cities)
Document Description
SCE proposes to construct, use, and maintain a series of new and upgraded high-voltage electric transmission lines (T/Ls) and substations to deliver electricity generated from new wind energy projects in eastern Kern County. The proposed Tehachapi Renewable Transmission Project (TRTP) ivolves several types of transmission upgrades, including: 1) construction fo a new 500kV T/Ls; 2) construction of a new single-circuit 200kV T/Ls; 3) re-building or existing 220kV lines to 500kV standards; 4) re-building of existing single-circuit T/Ls to double-circuit T/Ls; 5) relocation of several existing 66kV subtransmission lines; 6) construction of a new 500kV substation; and 7) upgrades or expansions of five existing substations.

Contact Information

Name
John Boccio
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Counties
Kern, Los Angeles, San Bernardino
Zip
various
State Highways
2, 14, 19, 39, 57, 60, 138
Waterways
San Gabriel River, Rio Hondo, Amargosa Creek
Other Location Info
Crosses 23 Cities

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Major Industrial Projects, California Department of Conservation (DOC), California Department of Fish and Wildlife, Habitat Conservation Planning (CDFW), California Energy Commission, California Highway Patrol, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Lahontan Victorville Region 6 (RWQCB), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California Santa Monica Mountains Conservancy (SMMC), California State Lands Commission (SLC), Resources Agency, California Native American Heritage Commission (NAHC), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), Department of Water Resources
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), Department of Water Resources
Development Types
Power:Electric Transmission Lines
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print