Western Municipal Water District's 2320 Pressure Zone Tank Site, Phase III

3 Documents in Project

Summary

SCH Number
2007081155
Lead Agency
Western Municipal Water District
Document Title
Western Municipal Water District's 2320 Pressure Zone Tank Site, Phase III
Document Type
NOD - Notice of Determination
Received
Posted
7/7/2009
Present Land Use
Property designated as Rural Residential
Document Description
The purpose of the proposed project is to ensure adequate water supply and service to the District's customers under the South Added Facilities Area Master Plan. Phase III of the interim plan includes the construction of the 2320 Pressure Zone Tanks will include two water tanks with a capacity to hold 5.4 million gallons of water. One water tank will be constructed now and the second will be constructed in the future. The project also includes a 0.7 mile of 24" waterline within either the Rolling Meadows Drive right-of-way (from Rocky Bluff Road to just north of Hidden Valley Road) or public utility easement, designed to convey potable water from the proposed 2320 Pressure Zone water tank.

Contact Information

Name
Thomas H. Safford
Agency Name
Western Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Cross Streets
Rolling Meadows Drive from Rocky Bluff Road to just north of Hidden Valley Road
Zip
92570
Total Acres
~6.84
Parcel #
Various and 289-240-007
Township
4S
Range
5W
Section
35
Base
SBB&M

Notice of Determination

Approving Agency
Western Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print