Robert A. Skinner Water Treatment Plant Solar Power Generation Facility

3 Documents in Project

Summary

SCH Number
2007081122
Lead Agency
Metropolitan Water District of Southern California
Document Title
Robert A. Skinner Water Treatment Plant Solar Power Generation Facility
Document Type
NOD - Notice of Determination
Received
Posted
8/15/2008
Present Land Use
Water Filtration Plant / R-R / Public Facilities

Document Description
The project consists of two minor physical modifications: 1) move the access road location approximately 300 feet upstream of the existing temporary access road, and 2) increase in size of the total solar power generation facility (an increase of approximately 2.15 acres over the previously proposed 11 acres) to accommodate the larger space requirements for the solar panels.

Contact Information
Debbie Drezner
Metropolitan Water District of Southern California
700 N. Alameda Street P.O. Box 54153
Los Angeles, CA 90054-0153

Phone : (213) 217-5687

Location

Cities
Hemet
Counties
Riverside
Cross Streets
Benton Road and Washington Street
Zip
92596
Total Acres
8
Parcel #
964-030-010
State Highways
79
Airports
French Valley
Schools
French Valley Elementary, Lavorgna Elementary
Waterways
Tucalota Creek
Township
7S
Range
2W
Section
3
Base
SB

Notice of Determination

Approving Agency
Metropolitan Water District of Southern California
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Metropolitan's Headquarters 700 North Alameda Street Los Angeles, CA 90012

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print