Swarthout Canyon Washout Repair
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007081089
- Lead Agency
- Regional Water Quality Control Board, Region 8 (Santa Ana), Riverside
- Document Title
- Swarthout Canyon Washout Repair
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/1/2007
- Present Land Use
- Undeveloped / Resource Conservation (RC) / Single Family Residential
- Document Description
- Issuance of a Clean Water Act Section 401 Water Quality Standards Certification for a pipeline cover repair. The pipeline is a petroleum line which lies within a perennial stream tributary to Cajon Wash in Lone Pine Canyon. The pipeline has been exposed. The area surrounding the pipeline will be excavated and a geotube installed around the line. The line will be covered with flexible concrete matting. A portion of an adjacent bank will be armored with grouted rip-rap to prevent further erosion. 0.08 acres of the wash will be affected by the armoring. An access road will need to be constructed from Swarthout Canyon Road to the project site affecting 0.8 acres of uplands. A 0.43 acre staging area will be cleared in the adjacent uplands.
- Contact Information
-
Adam Fischer
Regional Water Quality Control Board, Region 8
Lead/Public Agency
3737 Main Street, Suite 500
Riverside, CA 92501
Phone : (951) 320-6363
Location
- Counties
- San Bernardino
- Cross Streets
- West of I-15 and south of Highway 138 along Swarthout Canyon Road
- Total Acres
- < 1.4
- State Highways
- I-15
- Railways
- BNSF, UPRR
- Waterways
- Cajon Wash
- Township
- 2N
- Range
- 6W
- Section
- 11
- Base
- Cajon
- Other Location Info
- City/Nearest Community: Cajon
Notice of Determination
- Approving Agency
- Santa Ana Regional Water Quality Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Santa Ana Regional Water Quality Control Board, 3737 Main St. Ste 500, Riverside, CA 92501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.