Swarthout Canyon Washout Repair

2 Documents in Project

Summary

SCH Number
2007081089
Lead Agency
Regional Water Quality Control Board, Region 8 (Santa Ana), Riverside
Document Title
Swarthout Canyon Washout Repair
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2007
Present Land Use
Undeveloped / Resource Conservation (RC) / Single Family Residential
Document Description
Issuance of a Clean Water Act Section 401 Water Quality Standards Certification for a pipeline cover repair. The pipeline is a petroleum line which lies within a perennial stream tributary to Cajon Wash in Lone Pine Canyon. The pipeline has been exposed. The area surrounding the pipeline will be excavated and a geotube installed around the line. The line will be covered with flexible concrete matting. A portion of an adjacent bank will be armored with grouted rip-rap to prevent further erosion. 0.08 acres of the wash will be affected by the armoring. An access road will need to be constructed from Swarthout Canyon Road to the project site affecting 0.8 acres of uplands. A 0.43 acre staging area will be cleared in the adjacent uplands.

Contact Information

Name
Adam Fischer
Agency Name
Regional Water Quality Control Board, Region 8
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
West of I-15 and south of Highway 138 along Swarthout Canyon Road
Total Acres
< 1.4
State Highways
I-15
Railways
BNSF, UPRR
Waterways
Cajon Wash
Township
2N
Range
6W
Section
11
Base
Cajon
Other Location Info
City/Nearest Community: Cajon

Notice of Determination

Approving Agency
Santa Ana Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print