Gaviota Creek Bank Erosion Protection

3 Documents in Project

Summary

SCH Number
2007081032
Lead Agency
California Department of Transportation, District 5
Document Title
Gaviota Creek Bank Erosion Protection
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2008
Present Land Use
Transportation Corridor
Document Description
The Operator intends to alter the streambed to repair an eroded bank along the southbound off ramp of Highway 101. The work consists of 295 linear feet of bank protection, mostly of ungrouted rock rip-rap placed at the toe and then planted with native riparian species within the rock, and above the rock. The design requires 9 linear feet of rock gabions, covered with concrete, to transition from the 2:1 repaired slope, to the existing vertical concrete wall on the upstream side of the project area. This creek should dry out in late summer, and contains mulefat and coyote bush as the dominant species. Gaviota Creek is one of the best steelhead creeks in Santa Barbara County.

Contact Information

Name
Natasha Lohmus
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Solvang
Counties
Santa Barbara
Cross Streets
SR-101, SR-1
Total Acres
1
State Highways
SR-101
Schools
Vista Del Mar
Waterways
Gaviota Creek
Township
5N
Range
32W
Base
SBB&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes