Royal Mountain King Mine (RMK) NPDES Discharge System Project

Summary

SCH Number
2007078203
Public Agency
Fish & Game #2
Document Title
Royal Mountain King Mine (RMK) NPDES Discharge System Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/18/2007
Document Description
This agreement pertains to the Royal Mountain King Mine (RMK) NPDES Discharge System Project, which involves the construction of a discharge system that will provide for the capture and collection of spring water into Skyrocket Pit (SRP) and discharge of water from SRP into Littlejohns Creek Diversion Channel. The discharge from SRP will be controlled by automatic valves held in six concrete vaults near the base of the SRP dam. Water will pass through 1,500 feet of 32-inch HDPE. Width of disturbance for pipeline construction is 25 feet. The discharge structure is a concrete flume measuring approximately 110 feet long, 10 feet wide and 6 to 10 feet in height. Riprap aprons approximately 50 feet wide by 60 feet long will be placed at entrance and exit of the flume, to prevent scour and eroding of the creek. A concrete headwall 80 feet in width will divert streamflow into the flume, as described in Notification 1600-2007-0180-R2.

Contact Information

Name
Dale Watkins
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Other Location Info
City/Community: Copperopolis

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15303
Reasons for Exemption
Minor new construction without significant environmental impact.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print