University Housing and Food Service Phase I
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007072135
- Lead Agency
- California State University, Chico
- Document Title
- University Housing and Food Service Phase I
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/20/2007
- Present Land Use
- University property with existing residence hall activity center / Zoned Secondary Open Space (OS2) / General Plan designation Public Facilities and Services (PF&S).
- Document Description
- The project will construct two buildings: a five-story residence hall and residential dining complex (100,700 GSF) and a two-story residential life program building (12,500 GSF). The residence hall will house 220 students and 6 resident advisors in 76,100 GSF on the upper floors. A food service facility will occupy the first floor and basement, totaling ~24,600 GSF. The food service facility will replace the existing food service in Whitney Hall and will serve all on-campus student residents.
- Contact Information
-
Joel Trenalone
California State University Trustees
Lead/Public Agency
401 Golden Shore
Long Beach, CA 90802-4210
Phone : (530) 898-4513
Location
- Cities
- Chico
- Counties
- Butte
- Cross Streets
- Legion, Warner
- Zip
- 95929
- Total Acres
- 1.7
- State Highways
- 32 and 99
- Railways
- Southern Pacific Railroad
- Schools
- Chico Senior High School
- Waterways
- Big Chico Creek
Notice of Determination
- Approving Agency
- Trustees
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- CA State University Chico, Facilities Management, First and Normal Streets, Chico, CA 95929 and CSU Chancellor's Office, Capital Planning, Design, and Construction, 401 Golden Shore, Long Beach, CA 90802-4210
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.