Kuhn Residence
2 Documents in Project
Summary
SCH Number
2007072072
Lead Agency
Placer County
Document Title
Kuhn Residence
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2008
Present Land Use
Vacant/Undeveloped, Residential Agricultural, building site minimum of 100,000 square feet combining Traffic Management, Planned Development designation of 0.44 dwelling units per acre.
Document Description
This project includes grading of 2.5 acres for the construction of a single family residential home, a secondary dwelling, detached garage, recreation room and tennis court. The project includes disturbance to 6,880 cubic yards of material with cuts up to nine feet and fills up to five feet. The grading will result in the removal of seven native trees totaling 72 inches. The trees to be removed include five cottonwood trees and two oak trees. The majority of the subject parcel is encumbered by a pond and riparian vegetation associated with Strap Ravine. The proposed grading will not impact riparian areas, nor will grading work be done within the required setback of riparian areas or water bodies.
Contact Information
Name
Peg Rein
Agency Name
Placer County Planning Department
Contact Types
Lead/Public Agency
Phone
Location
Counties
Placer
Cross Streets
Douglas Boulevard, Barton Road
Zip
95746
Total Acres
14.7
Parcel #
048-142-022
Schools
Eureka School District
Township
10N
Range
7E
Section
10
Base
MDB&M
Other Location Info
City/Nearest Community: Granite Bay
Notice of Determination
Approving Agency
Placer County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.