Kellogg Creek Bio-Filter/Retention Basin Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007072053
- Lead Agency
- Reclamation District No. 800 - Byron Tract (RD800)
- Document Title
- Kellogg Creek Bio-Filter/Retention Basin Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/20/2007
- Present Land Use
- Zoned: Planned Unit-1 General Plan Designation: Parks, Public Watershed Lands, and Deed Restricted Open Space
- Document Description
- The project proposes to construct an approximate 4-acre bio-filter/retention basin on a 13-acre parcel intended to treat flows and remove sediment from Kellogg Creek before entering Discovery Bay. The basin is to remove a minimum of 50 percent of the sediment load and associated pollutants from the agricultural tailwater and stormwater flows of Kellogg Creek.
- Contact Information
-
Jeff Conway
Reclamation District No. 800
Lead/Public Agency
1540 Discovery Bay Boulevard, Suite A
Discovery Bay, CA 94514
Phone : (925) 634-2351
Location
- Counties
- Contra Costa
- Cross Streets
- Highway 4 and Bixler Road
- Zip
- 94515
- Parcel #
- 011-220-022
- State Highways
- 4
- Waterways
- Kellogg Creek, Cavalho Drain, Discovery Bay, Sacramento/San Joaquin Delta
- Township
- 1N
- Range
- 3E
- Section
- 35
- Base
- Woodward
- Other Location Info
- City/Nearest Community: Discovery Bay
- Other Information
- Base: Woodward Island
Notice of Determination
- Approving Agency
- Reclamation District 800
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Office of Reclamation District 800
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.