Valley of the Moon Water District Well No. 5 Replacement Project

2 Documents in Project

Summary

SCH Number
2007072025
Lead Agency
Valley of the Moon Water District
Document Title
Valley of the Moon Water District Well No. 5 Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2007
Present Land Use
Rural Residential / RRB5 (Rural Residential with a building density of 5 units per acre)
Document Description
The Valley of the Moon Water District (District) proposes to replace an abandoned production well on the 7,500 square foot parcel it owns on the south side of Verano Avenue near the intersection of Arnold Drive in El Verano. The depth of the well would be 680 feet, and the pumping rate would be approximately 300 gallons per minute (GPM) over a 24 hour per day period. The well would be used to augment the District's existing water supply during peak water demand periods; therefore, the well is expected to be in use for approximately four months each year. The annual water production from this well is projected to total approximately 160 acre feet. A small concrete block building would be built to house the well, pump, and appurtenances.

Contact Information

Name
Krishna Kumar
Agency Name
Valley of the Moon Water District
Contact Types
Lead/Public Agency

Location

Counties
Sonoma
Regions
Unincorporated
Cross Streets
Verano Avenue, Arnold Drive
Zip
95476
Parcel #
052-332-011
State Highways
12
Schools
El Verano Elementary School
Waterways
Sonoma Creek, Dowdall Creek

Notice of Determination

Approving Agency
Valley of the Moon Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print