P-CUP-08-006/Conditional Use Permit for a Cellular Communications Tower and Facility
108 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007072023
- Lead Agency
- Modesto, City of (City of Modesto)
- Document Title
- P-CUP-08-006/Conditional Use Permit for a Cellular Communications Tower and Facility
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/26/2008
- Present Land Use
- Various. The proposal would not make substantial changes to current land use designations.
- Document Description
- The project is a Conditional Use Permit to add a 75-ft high, slim-line cellular monopole with up to 12 antennas concealed within a fiberglass radome, with associated equipment cabinets inside a 336-sq. ft. lease area, surrounded by a six-foot tall decorative fence. Although the use is permitted in the C-1 Zone, a conditional use permit is required becuse the height exceeds the height limit of 35 ft allowed in the zone.
- Contact Information
-
Kristinae Toomians
City of Modesto
P.O. Box 642 1010 Tenth Street, Suite 3300
Modesto, CA 95353
Phone : (209) 577-5272
Location
- Cities
- Modesto
- Counties
- Stanislaus
- Cross Streets
- Highway 99 and Highway 132
- State Highways
- 99, 108, 132
- Railways
- BNSF, UPRR, M&ET
- Airports
- Modesto Ci.-Co. Airport; Harry S
- Waterways
- Dry Creek, Tuolumne River, Stanislaus River
- Other Information
- Airports (Cont): Harry Sham Field
Notice of Determination
- Approving Agency
- City of Modesto
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City Clerk, City of Modesto 1010 Tenth Street Modesto, CA 95354
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.