SR 60/ Moreno Beach Drive Interchange Improvement Project (Streambed Alteration Agreement No. 1600-2019-0252-R6)

5 Documents in Project

Summary

SCH Number
2007071068
Lead Agency
California Department of Transportation, District 8 (DOT)
Document Title
SR 60/ Moreno Beach Drive Interchange Improvement Project (Streambed Alteration Agreement No. 1600-2019-0252-R6)
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2020
Document Description
The project proposes the construction of a westbound off ramp to Moreno Beach Drive, north of SR-60. Also, at Moreno Beach Drive a loop onramp with auxiliary lane for northbound traffic and a direct onramp for southbound traffic are proposed for vehicles to complete the southbound to westbound SR-60 movement. The existing two-lane bridge will be replaced with a new overcrossing. Currently, 3 ephemeral drainages transect the Project area. To complete the proposed Project, permanent grading and fill will occur in portions of “Drainage 2.3”, “Drainage 2.4” and “Drainage 3.2”

Contact Information

Name
Eric Chan
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
Moreno Valley
Counties
Riverside
Regions
Southern California
Other Information
The project is located at the intersection of State Route 60 and Moreno Beach Drive, in the City of Moreno Valley, California; Latitude 33.93482°, Longitude -117. 15408°. The streambed alteration/construction is within an unnamed tributary which ultimately drains to the Santa Ana River.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print