Universal City Vision Plan

12 Documents in Project

Summary

SCH Number
2007071036
Lead Agency
City of Los Angeles
Document Title
Universal City Vision Plan
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2014
Present Land Use
Major Industrial/Commercial (County); Regional Center, Low/Minimum/Medium Density Residential, Limited Commercial (City)
Document Description
The project, a component of the NBC Universal Evolution Plan, includes construction of a new southbound (SB) on-ramp to SB US-101 from Universal Studios Boulevard (USB), as well as shifting and widening SB US-101 to extend the existing two-lane portion of the Regal Place on-ramp. The project also includes closure of the existing SB off-ramp at Bennett Drive and modification and/or removal of five overhead signs along US-101. The project is located in Los Angeles County along US-101 from PM 9.34 to 10.15 and covers a distance of 0.8 miles. An addendum to the certified EIR was prepared by Caltrans. Exhibit A shows that applicable Fish & Game fees have already been paid.

Contact Information

Name
Ronald Kosinski
Agency Name
Cal. Department of Transportation
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Universal City Plaza
Zip
91608
Total Acres
391
Parcel #
Various
State Highways
US 101, SR 134
Railways
No
Airports
No
Schools
Various (i.e., Valley View ES, Rio Vista ES, etc.)
Waterways
Los Angeles Flood Control Channel (LAFCC)
Township
1N
Range
14W
Section
27,28,
Base
SBB&M
Other Information
Section: 29, 33

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print