Proposed South Region Elementary School No. 1, Removal Action Workplan

Summary

SCH Number
2007068178
Public Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Proposed South Region Elementary School No. 1, Removal Action Workplan
Document Type
NOE - Notice of Exemption
Received
Posted
6/15/2007
Document Description
This project involves the Department of Toxic Substances Control (DTSC) approval of a Removal Action Workplan (RAW) which will be carried out at the Proposed South Region Elementary School No. 1 site for the excavation and off-site disposal of soils contaminated with lead.

Contact Information

Name
Ann Chang
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15330
Reasons for Exemption
1. The project is a minor cleanup action to be taken to prevent, minimize, stabilize, or eliminate the release or threat of release of a hazardous waste or hazardous substance. The estimated cost is $890,000 which falls below the cost criteria of $1 million identified in California Code of Regulations, title 14, section 15330. The estimated cost includes costs for preparation, approval and implementation of the RAW, excavation and offsite disposal of COC contaminated soils, and DTSC oversight. 2. The site is not on the Hazardous Waste and Substances Sites list, compiled pursuant to Government Code section 65962.5 and is not in a sensitive area of biological or cultural resource significance. 3. The RAW includes an Excavation Plan, Engineering Evaluation/Cost Analysis, Health and Safety Plan, Quality Assurance Project Plan, Transportation Plan, and Air Monitoring and Dust Control Plan. This removal action will not have a significant effect on the environment because of the relatively small volume (approximately 1,544 cubic yards), low level of work activity (minor excavation and disposal), short project duration (approximately 30 working days), and control measures associated with excavation and off-site disposal of the contaminated soils at the site.