Thomas Shaft Road Improvement Project

2 Documents in Project

Summary

SCH Number
2007062116
Lead Agency
City and County of San Francisco
Document Title
Thomas Shaft Road Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2008
Present Land Use
Project site is an existing roadway with the adjacent land, designated as nonprime agriculture and used for grazing.
Document Description
The project consists of modifying and improving the existing 1.5-mile Thomas Shaft Road, between Corral Hollow Road and the San Francisco Public Utilities Commission Thomas Shaft Chlorination Facility. The project would realign or widen some portions of the roadway, as well as improve the roadway surface. Also, as part of the project, an existing temporary concrete water flow structure would be replaced an arch span bridge, one existing culvert would be replaced, and two new culverts installed along the road.

Contact Information

Name
Deborah Green
Agency Name
San Francisco Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Cities
Tracy
Counties
San Joaquin
Cross Streets
Corral Hollow Road
Total Acres
6.25
Parcel #
251-17-001, 002, 004; 251-33-009, 010, 012
Schools
Buena Vista
Waterways
Polhemus and San Mateo Creeks; Crystal Springs and San Andreas Reservoirs

Notice of Determination

Approving Agency
San Francisco Public Utilities Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print