North Stockton Railroad Grade Separations and Bridge Replacements Project (IS7-07)

4 Documents in Project

Summary

SCH Number
2007062052
Lead Agency
City of Stockton
Document Title
North Stockton Railroad Grade Separations and Bridge Replacements Project (IS7-07)
Document Type
NOD - Notice of Determination
Received
Posted
8/13/2009
Present Land Use
Public Streets
Document Description
The project proposes to reconstruct and widen Lower Sacramento Road over Bear Creek. The roadway will be ~5 ft higher than the existing Bear Creek Bridge. The new bridge over Bear Creek will be a 3-span concrete bridge structure. The pier foundations will consist of 24" CIDH piles. The roadway will have wide sidewalks that will also accommodate pedestrians and bicyclists. The new brisge piers at the Bear Creek Bridge will be located on both the north and south edge of the low-flow channel, requireing temporary dewatering during installation. The work area in Bear Creek will be dewatered prior to the start of work. Dewatering will consist of installation of a flow diversion to isolate the work area from the live channel. The flow diversion will consist of using K-rail with visquine, sandbags, or an equivalent method to isolate flows from the work area. Flows will be temporarily diverted to the center of the creek form both sides during pier foundation installation and also during removal of old piers.

Contact Information

Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
Eight Mile Road, Lower Sacramento Road, Morada Lane
Zip
95209, 10,
State Highways
I-5, SR-99
Schools
Sutherland and Westwood Elementaries
Waterways
Bear Creek, Pixley Slough, Woodbridge Irrigation District, South Main Canal
Township
2N, 3N
Range
6E
Section
33,34,
Base
MDB&M
Other Information
Zip Code: 95240, 95242 Sections: 35, 1, 9

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes