Natomas Levee Improvement Program Landside Components
31 Documents in Project
Summary
SCH Number
2007062016
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Natomas Levee Improvement Program Landside Components
Document Type
NOD - Notice of Determination
Received
Posted
11/30/2007
Present Land Use
Agricultural, Residential, Light Industrial, Industrial Office Park, and Industrial/Commercial Reserve
Document Description
The Sacramento Area Flood Control Agency (SAFCA) is proposing to implement the Natomas Levee Improvement Program (NLIP) Landside Improvements Project, which consists of installing improvements to the levee system in the Natomas Basin and making other related landscape modifications and drainage and infrastructure improvements. The NLIP would be implemented over a 3-year period extending from 2008 through 2010.
The EIR analysis addresses the potential environmental impacts associated with the 2008 activities on a project-specific basis, thereby providing the final CEQA-mandated environmental review before project implementation. The EIR analysis also addresses the potential environmental impacts associated with the overall project on a programmatic basis; therefore, the EIR constitutes a program EIR for all activities leading to the flood control system improvements that would occur during the 2008 through 2010 construction period. The flood control improvement activities planned to take place in 2009 and 2010 would be subject to additional project-specific CEQA analysis in the future, prior to proceeding with project implementation.
Contact Information
Name
John Bassett
Agency Name
Sacramento Area Flood Control Agency
Contact Types
Lead/Public Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Cross Streets
Numerous
Total Acres
53,000
State Highways
I-5, SR 99, SR 70, I-80
Airports
Sacramento International
Waterways
Sacramento and American Rivers, Natomas Cross Canal, Natomas East Main Drainage Canal
Other Location Info
City/Nearest Community: Natomas Basin
Notice of Determination
Approving Agency
Sacramento Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.