Sacramento Area Flood Control Agency-Phase 2, Natomas Levee Improvement Program Landslide Improvements Project (Issuance of California Endangered Species Act In

28 Documents in Project

Summary

SCH Number
2007062016
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Sacramento Area Flood Control Agency-Phase 2, Natomas Levee Improvement Program Landslide Improvements Project (Issuance of California Endangered Species Act In
Document Type
NOD - Notice of Determination
Received
Posted
8/3/2012
Present Land Use
Various, including flood control works, public right-of-way, and park
Document Description
To replace an existing high-density polyethylene pipe with a 10-inch diameter welded steel pipe through the levee (above the 200-year water surface elevation), and a 14-inch diameter pipe beyond the levee toe, installation of a replacement pump, new electrical equipment, restoration of existing pump columns for reuse, replacement of the pump platform, handrails and stairs, and restoration of electrical service.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Garden Highway and Natomas Park Drive
Zip
95833
Total Acres
Mutliple
State Highways
I-5, SR 99, I-80
Airports
Sacramento International
Waterways
Sacramento River/American River
Other Location Info
City/Nearest Community: Natomas

Notice of Determination

Approving Agency
CVFPB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print