Rio Dell Treated Wastewater Reuse Project

14 Documents in Project

Summary

SCH Number
2007062006
Lead Agency
Rio Dell, City of (City of Rio Dell)
Document Title
Rio Dell Treated Wastewater Reuse Project
Document Type
NOD - Notice of Determination
Received

Document Description
In May 2008 the City adopted a preferred wastewater improvement program (Adopted Project) as described in 2008 Certified EIR under Alternative 5. In June 2009 Addendum No. 1 was prepared to address temporarily installing some of the equipment (i.e., sludge press, covered storage area, and chlorination and dechlorination equipment) approved for the new treatment facility at the existing WWTF, until the new treatment facility is constructed. The new WWTF is anticipated to be constructed in 2011. The City would at this time prefer moving forward with Alternative 1, which consists of Wastewater Treatment Facility (WWTF) Option WWTF1 and Reuse System Option REUSE1A under Alternative 1, as described and analyzed in the 2008 Certified EIR and 2010 September 2010 Addendum No. 2. Option WWTF1 is to build a new WWTF in Rio Dell at the existing WWTF site (Rio Dell Corp Yard). This makes the temporary changes in Addendum No. 1 as mentioned above permanent. Reuse System Option REUSE1A includes a transmission pipeline from the WWTF to the irrigation site, new pump station at the existing WWTF, and flood irrigation (Type II irrigation) using a minimum of 10 acres at the proposed irrigation reuse site known as Mozzetti Lower.

Contact Information
Ron Hendrickson
City of Rio Dell
675 Wildwood Drive
Rio Dell, CA 95562

(707) 764-3532

Location

Cities
Rio Dell
Counties
Humboldt
Cross Streets
Highway 101
Zip
95562
Parcel #
Multiple
State Highways
Hwy 101
Railways
No
Airports
No
Schools
Rio Dell E.S.
Waterways
Eel River
Township
1N, 2N
Range
1E, 1W
Section
Many
Base
HB&M

Notice of Determination

Approving Agency
City of Rio Dell
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of Rio Dell 675 Wildwood Ave Rio Dell, CA 95562

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes