Wastewater Treatment Plant Upgrade and Disposal Project; Clean Water State Revolving Fund (CWSRF) No. C-06-7101-110
14 Documents in Project
Summary
SCH Number
2007062006
Lead Agency
City of Rio Dell
Document Title
Wastewater Treatment Plant Upgrade and Disposal Project; Clean Water State Revolving Fund (CWSRF) No. C-06-7101-110
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2013
Present Land Use
General Plan Designation: Agriculture Exclusive, Agriculture Conservation, Agriculture Industrial, Timber Production and other similar designations.
Document Description
The City of Rio Dell is proposing a modification to the Dell Rio Wastewater Reuse Project. The alignment and methodology of the sewer transmission pipeline where it crosses the Eel River, northwest of the City of Rio Dell, are proposed to be modified. Rather than crossing the Eel River within the southbound highway 101 bridge, the pipeline is proposed to cross underneath the Eel River using horizontal directional drilling techniques. This represents a minor change to the pipeline alignment of treated effluent reuse Option Reuse 1A as evaluated in the 208 Certified EIR. No other change to the Rio Del Wastewater Reuse Project is proposed. The State Lands Commission action is a 25 year General Lease--Public Agency Use through August 23, 2038.
Contact Information
Name
Reid Boggiano
Agency Name
CSLC
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Rio Dell
Counties
Humboldt
Cross Streets
Highway 101
Zip
95562
Parcel #
052-061-053, 205-111-039
State Highways
Hwy 101
Railways
No
Airports
No
Schools
Rio Dell E.S.
Waterways
Eel River
Township
2N
Range
1W
Section
36
Base
HB&M
Other Location Info
Eel River
Notice of Determination
Approving Agency
CSLC
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.