Santa Anita Sediment Removal Project

5 Documents in Project

Summary

SCH Number
2007061093
Lead Agency
Los Angeles County
Document Title
Santa Anita Sediment Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2010
Document Description
The Applicant (Los Angeles County Flood Control District, LACFCD) is proposing to alter the streambed and bank through the removal of approximately 500,000 cubic yards of sediment from the reservoir to minimize impacts to the valves and to ensure The California Department of Water Resources Division of Safety of Dams (DSOD) requirements are met. The Applicant proposes to remove the sediment in the late spring through early winter when inflow in limited. Concurrent with the sediment removal activities, LACFCD also proposes constructing a riser on the dam's lowest outlet gate to allow water above El. 1,230 feet to freely pass through the dam, thus ensuring that DSOD's seismic requirements are met. To make use of the impounded water below El. 1,230 feet, when conditions allow, LACFD will install additional slide gates on the existing risers for the valves.

Contact Information

Name
Jamie Jackson
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Arcadia
Counties
Los Angeles
Cross Streets
Elkins Ave. and Highland Oaks Drive
Zip
91006
Total Acres
13
State Highways
I-210
Schools
Highland Oaks Park, Foothill
Waterways
Santa Anita Wash, Santa Anita Dam, Santa Anita Reservoir
Township
1N
Range
11W
Section
22

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print