San Diego Creek Reach II Operations and Maintenance Project (Lake or Streambed Alteration Agreement No. 1600-2021-0010-R5)

9 Documents in Project

Summary

SCH Number
2007061076
Lead Agency
Orange County
Document Title
San Diego Creek Reach II Operations and Maintenance Project (Lake or Streambed Alteration Agreement No. 1600-2021-0010-R5)
Document Type
NOD - Notice of Determination
Received
Posted
11/19/2021
Document Description
The project is limited to the maintenance and operation of the San Diego Creek Reach II site. Project activities consist of sediment and vegetation removal in order to restore the channel to its as-built condition, subsequent routine vegetation and sediment removal to maintain the designed channel cross-sections, slope repair, re-grading, and semi-annual facilities inspections.

Contact Information

Name
Jennifer Blackhall
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
located at San Diego Creek
Counties
Orange
Regions
Southern California
Other Location Info
The project location is in Reach II of the San Diego Creek channel, spanning from the I-405 freeway south to Campus Drive in the City of Irvine (Exhibit A), and includes the main San Diego Creek channel and two man-made in-channel sediment basins named Basin 2 and Basin 3.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print