San Diego Creek Reach II Operations and Maintenance Project (California Endangered Species Act Incidental Take Permit No. 2081-2011-052-05 (ITP))

9 Documents in Project

Summary

SCH Number
2007061076
Lead Agency
Orange County
Document Title
San Diego Creek Reach II Operations and Maintenance Project (California Endangered Species Act Incidental Take Permit No. 2081-2011-052-05 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
7/12/2017
Document Description
Project includes the SD Creek Channel from I-405 to Campus Drive which will be restored and maintained to contain the 100-year flood carrying capacity and will include a defined 40-foot corridor or riparian vegetation on the east bank of the channel. This segment of SD Creek will be restored and maintained through vegetation management and sediment removal. Initial vegetation removal and maintenance of this segment of SD Creek Channel will allow for the full operation of the in-line channel sediment basins, providing water quality protection of Upper Newport Bay and the San Joaquin Marsh, and management of riparian habitat for sensitive wildlife species. The in-line sediment basins would be maintained by periodic removal of accumulated sediment and vegetation removal, when the sediment exceeds approx. 50% of the basin capacity. Various maintenance projects have occurred over the years within the limits of the Project area. In 2003 and 2004, the U.S. Army Corps of Engineers authorized emergency dredging and vegetation removal activities (ER Project) within the project area that was completed in March 2004. However, seasonal restrictions prevented removal of all sediment required to reestablish food capacity in the channel. The ER Project included the removal of 11.2 acres of native riparian vegetation from project area. The SD Creek Completion Maintenance (Completion Project) authorized a one-time clearance of riparian vegetation within the exact footprint of the Emergency Project since March 2007. The Completion Project removed riparian vegetation, established since March 2004. The current project will remove riparian vegetation established within the footprint of the Emergency Project since March 2007, and an additional permanent removal of 3.9 acres and temporary removal of 0.60 acre of native riparian vegetation outside of the Emergency Project area footprint. This permit includes and adds additional conditions to the previous Completion Project's compensatory mitigation, as the Completion Project only authorized temporary removal (one-time removal). This project reflects additional conditions for approval for 15.1 acres to be permanently removed and replaced off-site. Therefore, as part of long-term operations and maintenance the above mentioned areas will be maintained for flood control and sediment capture and authorized under this Permit pursuant to the Operations and Maintenance Manual. Project will result in the permanent loss of 15.1 acres of least Bell's virea (Vireo belli pusillus) habitat and temporary impacts to 0.6 acre of least Bell's vireo habitat. The project is expected to result in incidental take of least Bell's vireo, which is designated as an endangered species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of project implementation.

Contact Information

Name
Marilyn Fluharty
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Irvine, Newport Beach
Counties
Orange
Cross Streets
MacArthur Boulevard and Jamboree Road, Michaelson Drive and Jamboree Road
Zip
92621, 60,
Total Acres
4.2
State Highways
I-405, SR-73
Railways
BNSF Railroad
Airports
John Wayne Airport (SNA)
Schools
UC Irvine
Waterways
San Diego Creek Channel, Upper Newport Bay
Township
6S
Range
9W
Section
58
Base
Tustin
Other Information
Zip Codes: 92621, 60, 90

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print