Operation of a Well and Treatment Facility

4 Documents in Project

Summary

SCH Number
2007052110
Lead Agency
South Tahoe Public Utility District
Document Title
Operation of a Well and Treatment Facility
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2012
Present Land Use
TRPA Regional Plan Zoning: Single Family Residential, Resource Management, Recreation, Public Service
Document Description
The California Department of Public Health (Department), as the responsible agency, will be issuing a water supply permit. The South Tahoe PUD proposed project included a control building and treatment facility to be constructed to house mechanical and electrical controls, corrosion control treatment and disinfectant equipment for the operation of a proposed water supply well. The new 1,400 gpm well would replace two existing municipal water wells operated at the site.

Contact Information

Name
Richard Hinrichs
Agency Name
CA Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
South Upper Truckee Road
Zip
96150
Parcel #
036-581-01
State Highways
SR 89, Highway 50
Airports
Lake Tahoe Airport
Schools
Lake Tahoe Environmental Education School and South Tahoe HS
Waterways
Upper Truckee River
Township
11N
Range
18E
Section
18,19
Other Location Info
City/Nearest Community: Meyers

Notice of Determination

Approving Agency
CA Department of Public Health
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print